Installation and Startup

This section details the installation requirements, the installation and system startup and shutdown. Before you install and configure the software, you should plan the installation.

Important Checklist Before Installation

The items listed below must be checked before an installation can be done on site. Before an installation can be started make sure:

  • Camera adjustments/shifts should always be set by camera personnel before any lens calibration is done. After any adjustments/shifts are set, the camera cannot be adjusted without being reconfigured.

  • Cables: Who is in charge of the cabling before doing an installation?

  • Tracking: What are the tracking system protocols?

  • Transfer of tracking data: How is tracking data transferred and what kind of cables are used?

  • Synchronization sources: What type of synchronization sources used?

    • Blackburst

    • Tri-level

    • Digital input 1&2 using SDI in

  • Location of the Viz Engines: Do you have physical access to the machines?

  • Coordinate system: What are the coordinate systems for the tracking system(s) used?

  • Make sure that there are no firewalls